Planta hidroeléctrica de 1.000 Kw para Guaranda./ Arturo Mora Velez
Material type:
Item type | Current location | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|---|---|
![]() |
BIBLIOTECA DE ING. ELÉCTRICA Y ELECTRÓNICA | TESIS (NIVEL II) | E5 | 621.312134 M827 TESIS (Browse shelf) | Ej. 1 | Available | 971 | ||
![]() |
BIBLIOTECA GENERAL | T-IE/0007 (Browse shelf) | Ej. 2 | Available | 026217 |
Browsing BIBLIOTECA DE ING. ELÉCTRICA Y ELECTRÓNICA shelves, Shelving location: E5, Collection: TESIS (NIVEL II) Close shelf browser
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
621.312134 M244 TESIS Confiabilidad del proyecto Paute mediante el concepto de probabilidad de pérdida de carga LOLP./ | 621.312134 M337 TESIS Remodelación de la central hidroéctrica Guagopolo./ | 621.312134 M552 TESIS Diseño del sistema eléctrico y de control de una minicentral hidroeléctrica de 100 Kw./ | 621.312134 M827 TESIS Planta hidroeléctrica de 1.000 Kw para Guaranda./ | 621.312134 M967 TESIS Proyecto de una central hidroeléctrica de alta presión./ | 621.312134 M976 TESIS Proyecto Otavalo./ | 621.312134 P127 TESIS Proyecto Huapante./ |
FACULTAD DE INGENIERIA ELECTRICA Y ELECTRONICA Tesis (Ingeniero Eléctrico). -- Escuela Politécnica Nacional. 1956
Incluye referencia bibliográfica
Se presenta una visión general del servicio eléctrico de Guaranda, y los proyectos que piensa llevar adelante el Municipio del lugar para mejorar la situación. Esto se logrará en parte con la planta hidroeléctrica a construírse aprovechando el caudal del río Salinas con una caída bruta de 220 m. Los cálculos de las obras mecánicas y civiles de esta planta se detallan y además se dan criterios sobre generadores, línea de transmisión y turbinas.
There are no comments on this title.